ECAP signed a Contract for the Detailed Design
Services of Yarımca Container Terminal Project.

ECAP signed a Contract for the Detailed Design
Services of Yarımca Container Terminal Project.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Yarımca Container Terminal hosts the first container vessel.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
Manifa Field Causeway Project has been successfully completed.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
EPIC for Gabro Berth 3 Project has been successfully completed.