ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Related Posts
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Epic for Container Terminal Berth 7 Project has been successfully completed.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
EPIC for Gabro Berth 3 Project has been successfully completed.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Manifa Field Causeway Project has been successfully completed.