MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
![MIP's-Solution-Partner-in-Design MIP's Solution Partner in Design](https://ecap.com.tr/wp-content/uploads/2020/04/MIPs-Solution-Partner-in-Design.jpg)
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.