MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.

MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.

Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
Manifa Field Causeway Project has been successfully completed.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Yarımca Container Terminal hosts the first container vessel.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.

