Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.

Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.

MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Manifa Field Causeway Project has been successfully completed.

