Manifa Field Causeway Project has been successfully completed.

Manifa Field Causeway Project has been successfully completed.

Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
EPIC for Gabro Berth 3 Project has been successfully completed.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Yarımca Container Terminal hosts the first container vessel.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Epic for Container Terminal Berth 7 Project has been successfully completed.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.

