Yarımca Container Terminal hosts the first container vessel.
![Maiden-Mooring-at-Yarımca Maiden Mooring at Yarımca](https://ecap.com.tr/wp-content/uploads/2020/04/Maiden-Mooring-at-Yarımca.jpg)
Yarımca Container Terminal hosts the first container vessel.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Manifa Field Causeway Project has been successfully completed.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.