

Related Posts
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Epic for Container Terminal Berth 7 Project has been successfully completed.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.


