Epic for Container Terminal Berth 7 Project has been successfully completed.

Epic for Container Terminal Berth 7 Project has been successfully completed.

ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
Manifa Field Causeway Project has been successfully completed.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.

