ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.

ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
Manifa Field Causeway Project has been successfully completed.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.