ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.

ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.

Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Manifa Field Causeway Project has been successfully completed.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
EPIC for Gabro Berth 3 Project has been successfully completed.
Yarımca Container Terminal hosts the first container vessel.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.

