Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.

Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.

ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
EPIC for Gabro Berth 3 Project has been successfully completed.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Yarımca Container Terminal hosts the first container vessel.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
Manifa Field Causeway Project has been successfully completed.