ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project

ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project

Manifa Field Causeway Project has been successfully completed.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
EPIC for Gabro Berth 3 Project has been successfully completed.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.

