Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.

Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.

Yarımca Container Terminal hosts the first container vessel.
Manifa Field Causeway Project has been successfully completed.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.

