Yarımca Container Terminal hosts the first container vessel.

Yarımca Container Terminal hosts the first container vessel.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
EPIC for Gabro Berth 3 Project has been successfully completed.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.