Yarımca Container Terminal hosts the first container vessel.

Yarımca Container Terminal hosts the first container vessel.

Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Manifa Field Causeway Project has been successfully completed.
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
EPIC for Gabro Berth 3 Project has been successfully completed.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.

