Check out our Deputy General Manager, Mr. Celalettin
Ilhan’s Article published on Denizcilik Dergisi(in Turkish).

Check out our Deputy General Manager, Mr. Celalettin
Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
EPIC for Gabro Berth 3 Project has been successfully completed.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
Yarımca Container Terminal hosts the first container vessel.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.