ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.

ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.

ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
Manifa Field Causeway Project has been successfully completed.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Epic for Container Terminal Berth 7 Project has been successfully completed.

