Manifa Field Causeway Project has been successfully completed.

Manifa Field Causeway Project has been successfully completed.

Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).

