Manifa Field Causeway Project has been successfully completed.

Manifa Field Causeway Project has been successfully completed.

ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
Yarımca Container Terminal hosts the first container vessel.
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.

