Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.
Related Posts
Manifa Field Causeway Project has been successfully completed.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal