Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.

Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
EPIC for Gabro Berth 3 Project has been successfully completed.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
Manifa Field Causeway Project has been successfully completed.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.