Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
Related Posts
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
EPIC for Gabro Berth 3 Project has been successfully completed.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
ECAP is assigned the Design Review Services of New Baku International Sea Trade Port Complex Construction Project
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Yarımca Container Terminal hosts the first container vessel.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.