Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.

Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.
Manifa Field Causeway Project has been successfully completed.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Yarımca Container Terminal hosts the first container vessel.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.