

Related Posts
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Manifa Field Causeway Project has been successfully completed.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
Yarımca Container Terminal hosts the first container vessel.
Hoegh LNG appoints ECAP for Conceptual (civil, structural, maritime) Design of the Jetty within the scope of GasPak LNG Terminal Project in Port Qasim, Pakistan.

