MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.

MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.

Epic for Container Terminal Berth 7 Project has been successfully completed.
EPIC for Gabro Berth 3 Project has been successfully completed.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).
Engineering Services for Technical Capacity Assessment and Refurbishment of Berths No. 12; 13 and Jetty No 14 in Mersin International Port are to be carried out by ECAP.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18, and 19 in Misurata Commercial Harbour has been awarded to ECAP.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Cofferdam Design, Tender Documents Preparation and Tender Period Consultancy Services for Crescent Development Project at Baku Bay will be rendered by ECAP on behalf of Gilan Holding.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.