“ECAP signed a
Consultancy Agreement for
Supervisory Services of New
Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone
Administration. “

“ECAP signed a
Consultancy Agreement for
Supervisory Services of New
Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone
Administration. “

Manifa Field Causeway Project has been successfully completed.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
Construction Supervision Services For Construction of Berths 17,18 and 19 of Misurata Commercial Harbour is going on.
Yarımca Container Terminal hosts the first container vessel.
ECAP was awarded for the Development of New Misurata Container Terminal at Two Alternate Locations.
ECAP signed a Contract the Ministry of Transport of the Republic of Azerbaijan on Technical Control Services on Performance of Construction Works Under New Baku International Sea Trade Port Complex Construction Project.
Epic for Container Terminal Berth 7 Project has been successfully completed.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
Physical Model Testing of Musannah Fishery Harbour Oman Breakwater Sections to be executed by ECAP.

