Mersin International Port appoints ECAP for Re-Arrangement Design of the Port
Entrance and for the Design of New Jetties.
Related Posts
Yarımca Container Terminal hosts the first container vessel.
Manifa Field Causeway Project has been successfully completed.
ECAP is to carry out Tender Design Development, Preparation of Repair Methodologies and Tender Documents Services for Berths No. 14 & 15 on behalf of MIP.
MIP appoints ECAP for Condition Assessment and Detailed Inventory Services for his existing berths.
ECAP signed a Contract on Design Review of Quay Wall Design and Construction Methodology of Mersin East Med Hub Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Tender Design for Refurbishment of Berths 10A, 11A in Misurata Commercial Harbour.
Hydraulic Modeling Tests and Technical Assistance Services for Taqah Fishery Harbour Project in Oman are to be provided by ECAP.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
EPIC for Gabro Berth 3 Project has been successfully completed.
Design, Engineering and Consultancy Services for Kartepe Intermodal Logistics Terminal are undertaken by ECAP.
“ECAP signed a Consultancy Agreement for Supervisory Services of New Container Berths No 17, 18 and 19 on behalf of Misurata Free Zone Administration. “