Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18 and 19 in Misurata Commercial Harbour has been awarded to ECAP.

Planning and Tender Design Services for the Container Storage Yard of Berths 17, 18 and 19 in Misurata Commercial Harbour has been awarded to ECAP.

ECAP is assigned the General Design Development for Two Boat Basins at the Black Sea Coast of Georgia and Associated Numerical Modeling Studies.
Mersin East Med Hub Project celebrates the arrival of Ship to Shore and Rubber Tyred Gantry Cranes to MIP New Container Terminal
Construction Supervision Services Contract towards Refurbishment and Repair of Berth No.14 at Mersin International Port is granted.
Mersin International Port appoints ECAP for the Re-Arrangement Design of the Port Entrance and for the Design of New Jetties.
Epic for Container Terminal Berth 7 Project has been successfully completed.
Yarımca Container Terminal hosts the first container vessel.
ECAP to execute Engineering, Design and Consultancy Services within the Scope of Walvis Bay Gas Port Project in Namibia.
ECAP is awarded a Contract for Development of General Design for Boat Lift System Support Piers and Associated Infrastructure at Poti, Georgia.
The contract for the Execution of Mersin Port Development Project Construction Supervision Services has been signed.
ECAP signed a Contract on Detail Design and Engineering for Temporary Structures and Works for Construction of Substructures of Izmit Bay Suspension Bridge Project.
ECAP signed a Contract for the Detailed Design Services of Yarımca Container Terminal Project.
Tender Packages Preparation and Tender Period Consultancy Services for Mersin Port Development Project are to be carried out by ECAP.
ECAP to design the Temporary Structures of megaproject; Nador West Med Port Infrastructure at the Mediterranean Coast of Kingdom of Morocco.
Check out our Deputy General Manager, Mr. Celalettin Ilhan’s Article published on Denizcilik Dergisi(in Turkish).

