PROJECT :
KEBAN DAM WEIR IMPROVEMENT
     
CLIENT :
LIMAK CONSTRUCTION
CONSTRUCTION VALUE : 2.975.000 USD
GENERAL DESCRIPTION
OF THE PROJECT

:

87 bored piles were constructed by reverse circulation drilling in schist and cristallized limestone. The diameter of piles was 2000mm and the lengths varied between 45 m and 70 m. The total length of piles was 5000 meters. 15,738 cubic meters of concrete was cast and 1730 tons of reinforcement steel was used.