PROJECT :
THE CONSTRUCTION OF THE GRAND MOSQUE FOR H.H. SHEIKH ZAYED BIN SULTAN THE SECOND Abu Dhabi UAE
     
CLIENT :
IMPREG I LO R I ZZAN I DE ECCHER J.V.
CONSTRUCTION VALUE : 5.055.344 USD
GENERAL DESCRIPTION
OF THE PROJECT

:
Manufacturing of bored cast in - situ reinforced concrete piles of f 600 mm, 800 mm, 950 mm and 1250 mm dia. with temporary casing. Length s of piles vary from 16 m to 27 m.

Total length of piles installed is 110,800 m . 132 nos. static load test. All piles are integrity tested and all piles are washed with airlift method. Approximately 65, 673 m3 concrete was poured with tremie technique .