Government / Municipality

Defense
Infrastructures
Urban Development
Standards and Regulations
Communication
Telecommunication Networks
Transportation
Airport
Bridges
Ports and Harbors
Rail and Transit
Road and Highways
Tunnels
Power
Power Plants
Power Transmission and distribution Systems
Oil & Gas
Buildings

 

 
 
PROJECT :
DESIGN, CONSULTANCY AND SUPERVISION WORKS FOR IZMIR LIGHT RAIL TRANSPORT SYSTEM II. PHASE PROJECT, TURKEY
     
CLIENT :
IZMIR METROPOLITAN MUNICIPALITY
CONSTRUCTION VALUE : -
GENERAL DESCRIPTION
OF THE PROJECT

:
Design of Tunnels and Stations between F. Altay and Uckuyu with length 5.5km, Consultancy and supervision during construction.

Project is planning to promote the current 90.000 people/day transport capacity of system to 160.000 people/day with its content of 5.5 km. tunnel and 6 passenger station structures which will be constructed completely in subsoil. The project is expected to bring a solid answer to urban transport problem of Izmir by its commissioning at early 2007 with its total tunnel length of 17 km. The project which is designed as “Drilling Tunnel” is aiming to prevent additional traffic burden for Izmir urban society with tunnel construction 20 m below earth level. Project covers Izmirspor, Hatay, Goztepe, Poligon, Guzelyali, and Fahrettin Altay stations which will also serve Izmir society as pedestrian crossings with 4 pedestrian entrance points.