Government / Municipality

Defense
Infrastructures
Urban Development
Standards and Regulations
Communication
Telecommunication Networks
Transportation
Bridges
Ports and Harbors
Rail and Transit
Road and Highways
Tunnels
Power
Power Plants
Power Transmission and distribution Systems
Oil & Gas
Buildings

 

 
 
PROJECT :
63 KM, 36'' BOZÜYÜK-ADAPAZARI NATURAL GAS PIPELINE, PHASE 1, TURKEY (Location: Geyve - Bozöyük)
     
CLIENT :
BOTAS (Turkish Petroleum Pipeline Corporation)
CONSTRUCTION VALUE : 12.996.000 USD
GENERAL DESCRIPTION
OF THE PROJECT

:
Survey, construction and commissioning of 63 km, 36" x 11.1 mm spiral welded steel pipeline. The line pipes shall be externally extruded polyethylene coated.