Government / Municipality

Defense
Infrastructures
Urban Development
Standards and Regulations
Communication
Telecommunication Networks
Transportation
Bridges
Ports and Harbors
Rail and Transit
Road and Highways
Tunnels
Power
Power Plants
Power Transmission and distribution Systems
Oil & Gas
Buildings

 

 
 
PROJECT :
KEMERKÖY THERMAL POWER PLANT, COOLING WATER INTAKE SYSTEM CONSTRUCTION, TURKEY
     
CLIENT :
TURKISH ELECTRICITY AUTHORITYDESIGN AND CONSTRUCTION DEPARTMENT OF POWER PLANTS SECTION
CONSTRUCTION VALUE : 3.000.000 USD
GENERAL DESCRIPTION
OF THE PROJECT

:
The Project covers the construction of trench excavation, laying of bedding material under pipes & placing the pipes on aggregate filled bags, Removing of sheet pile by underwater cutting equipment, Installation of 59 pieces of steel pipes and 12*2 pieces of manholes along three lines, Installation of three intake heads weighing 96 ton each, The capacity of the water intake structure is 4 m3/sec, Installation of chlorination GRP pipes 200 mm in diameter & 1620 m in length laying along three lines parallel to the steel pipes.